Particulars / Special features
Completion of the job, from planning to hand over, took place in a very narrow timeframe of 3 months. Additionally all systems were installed during the continued normal operation of the remaining 8,000 m2 of space in the Altezza building.
Work done | Electrical installation, IT and Security technology |
---|---|
Customer | W&W Baugesellschaft |
Architect | Acers |
Engineering company | Nutz GmbH |
Area | 4.500m2 |
Construction costs | 1.000.000€ |
Work done
Dismantling of existing electrical equipment Installation of the following specifications:
Extension Siedle intercom
area wide instrusion alarm system for entire building area of GSK
instrusion alarm system for GSK
Access control for GSK and the entire building
electrical removal including lighting
IT infrastructure secondary and tertiary
Complete wiring including complete fire protection measures
Extension building control systems & automation technology