OTC – München

OTC München – Referenz Nutz GmbH
OTC München – Referenz Nutz GmbH

Particulars / Special features

Conversion of the existing office space into a showroom. Due to the limited power supply of the office area, a freely configurable load shutdown was installed for the customer.
The operation of the alarm system / access control system was incorporated via a common Mifare-Desfire card.
The server for the access control system was installed in the main office so that further (branch) offices can be managed in the future.

Work done Electrical installation, data technology and security technology
Customer EUBAG Operation GmbH
Architect S+W Architekten
Engineering company Line Consult / Nutz GmbH
Area 1.200 m²
Construction costs 280.000 €

Work done

  • Electrical engineering

  • lighting equipment

  • IT network

  • optical fiber Backbone

  • access control system

  • Alarm

  • Fire alarm system

Brandmeldeanlage – OTC München – Referenz Nutz GmbH
Elektrotechnik – OTC München – Referenz Nutz GmbH
Beleuchtungs-Anlage – OTC München – Referenz Nutz GmbH
Bender Außenansicht  – Bender München – Referenz Nutz GmbH

Bender Grünberg

Electrical installation, IT installation, Security technology
GfK - Growth from Knowledge - Nürnberg – Referenz Nutz GmbH

GfK – Growth from Knowledge

Security Technology & Electrical Installation
Außenansicht   – GSK München – Referenz Nutz GmbH

GSK-Altezza

Electrical installation, IT and Security technology
Oberanger 16 München – Referenz Nutz GmbH

Oberanger 16 – München

Electrical installation, IT installation, Security technology
OTC München – Referenz Nutz GmbH

OTC – München

Electrical installation, data technology and security technology

Neugierig geworden?

Eine Auswahl unserer Referenzobjekte finden Sie hier.